Commercial & Hospitality

Commercial architecture built for flow.

Cafés, restaurants, medical offices and retail spaces designed around how customers move and staff work — then carried through Change of Use, Health Department and Building & Safety approvals.

Alfred Coffee Beverly Boulevard storefront with green cylindrical sign drum
Alfred Coffee — Beverly Boulevard
Alfred Coffee Westwood interior with botanical wallpaper and arched windows

Why it matters

Good design is good operations.

In hospitality and retail, the floor plan is the business plan. Queue length, pickup visibility, equipment adjacency and seat count all affect revenue and staffing from day one.

Our experience across more than 25 Alfred Coffee locations means we plan those details early — and document them so plan checkers, contractors and health inspectors all see the same, complete picture.

Services

What we deliver.

Every engagement can include as much or as little of this as your project needs.

01

Café & Restaurant Design

Concept-to-permit architecture for coffee shops, bakeries, restaurants and bars, with layouts tuned for speed of service.

  • Front-of-house & bar planning
  • Kitchen & equipment coordination
  • Seating & occupancy planning
  • Storefront & signage integration
02

Commercial Tenant Improvements

Interior build-outs for retail, office and food-service tenants in existing buildings and shopping centers.

  • Landlord & center coordination
  • Space planning & test fits
  • Demolition & new-work plans
  • Reflected ceiling & lighting plans
03

Medical & Wellness Offices

Clinical suites, medical spas and wellness spaces planned for patient comfort, privacy and code compliance.

  • Exam & treatment room planning
  • Accessibility for patients
  • MEP coordination for medical use
  • Infection-control finishes
04

Change of Use

Turning a retail or office space into a restaurant or café often triggers new occupancy, parking, plumbing and accessibility requirements. We map them before you sign a lease.

  • Occupancy & egress analysis
  • Parking & zoning review
  • Plumbing fixture counts
  • Lease-stage feasibility reports
05

Health Department Permitting

Food-facility plans prepared and coordinated for Environmental Health plan check alongside the building permit.

  • Food-facility plan sets
  • Finish & equipment schedules
  • Grease interceptor coordination
  • Plan-check corrections
06

ADA Accessibility Upgrades

Path-of-travel, restroom and entry upgrades that satisfy California Building Code accessibility requirements.

  • Path-of-travel analysis
  • Accessible restrooms
  • Entry & counter upgrades
  • Parking & signage

From concept to permit

Four steps. One accountable architect.

Scroll to watch a project take shape — from survey lines on an empty lot to a coordinated, permit-ready building.

  1. 01

    Site & Feasibility Analysis

    Before design begins, we evaluate zoning codes, Change-of-Use requirements, existing conditions and budget parameters, so you know what is possible and what it will take.

    • Zoning, setbacks & height envelope
    • Change of Use & occupancy review
    • Existing-conditions survey
    • Budget & schedule framing
  2. 02

    Architectural Concept & Space Planning

    We craft functional, human-centered layouts and massing studies with direct principal involvement from Dr. Sheida Moradi at every design review.

    • Space planning & customer flow
    • Massing studies & 3D models
    • Material & lighting direction
    • Principal-led design reviews
  3. 03

    Construction Documents & Consultant Coordination

    We integrate structural, mechanical, electrical, plumbing (MEP) and Title 24 energy engineering into one coordinated, buildable drawing set.

    • Structural engineering
    • Mechanical, electrical & plumbing
    • Title 24 energy compliance
    • Accessibility (ADA / CBC 11B)
  4. 04

    Agency Permitting & Approvals

    We navigate LA Building & Safety, Planning and Health Departments, answering plan-check corrections until your permit is issued.

    • LADBS & city plan check
    • Planning & design review
    • Health Department plan check
    • Corrections through permit issuance

FAQ

Questions we hear most.

Do you design the café concept or only handle permits?

Both. Some clients come with a brand designer and need an architect of record to document and permit the space; others want us to lead the full design. On many Alfred Coffee locations we worked alongside the brand’s design team.

What is a Change of Use, and will my restaurant need one?

A Change of Use applies when a space changes occupancy type — for example, from retail to a restaurant. It can affect parking, plumbing, exits and accessibility. We review the space and the zoning before you sign a lease so there are no surprises.

Do you coordinate Health Department approval?

Yes. Food-facility projects need Environmental Health plan approval in addition to the building permit. We prepare and coordinate both submissions and respond to corrections.

How long does commercial permitting take in Los Angeles?

It depends on the jurisdiction, the scope and whether Planning or Health review is required. We outline a realistic schedule during feasibility and keep the submission complete to avoid extra correction rounds.

Which cities do you work in?

Across Los Angeles County and Ventura County, including the City of Los Angeles, Calabasas, Malibu, Beverly Hills, Santa Monica, Pasadena and more.

Consultation

Discuss your commercial or residential project.

Work directly with Dr. Sheida Moradi from initial feasibility through construction permitting.

  • 01A reply within one business dayEvery inquiry is read by the principal.
  • 02A feasibility conversationZoning, scope, budget and approvals — before you commit.
  • 03A clear proposalDefined scope, deliverables and permitting path.
Portrait of Dr. Sheida Moradi, principal architect
Sheida Moradi, Ph.D.Principal · California Licensed Architect · NCARB
Project type

We reply within one business day. Your details are only used to respond to your inquiry.