Case study — Hospitality
Alfred Coffee: 25+ locations.
How a long-running partnership with one of Los Angeles’ most recognizable coffee brands turned bold café concepts into permitted, buildable, high-volume spaces.

Overview
Every store different. Every permit on track.
Alfred Coffee is known for highly individual stores — a green sculptural drum on Beverly Boulevard, terracotta and timber in Malibu, mint lacquer and marble on Robertson, botanical wallpaper in Westwood. No two locations look alike, yet each must deliver the same fast, consistent service.
Working alongside the brand’s design team, Sheida Moradi Architects has contributed to more than 25 locations, translating concept designs into coordinated construction documents and guiding them through agency approvals.
The challenge
Each new café brought its own building, landlord and jurisdiction — from the City of Los Angeles to Malibu and Pasadena. Many involved a Change of Use, all required Health Department food-facility approval, and nearly all needed accessibility upgrades to existing buildings.
Our role
- Site and code feasibility for prospective locations
- Architectural documentation of brand concepts
- Bar, equipment and back-of-house coordination
- Change of Use, occupancy and accessibility compliance
- Building & Safety and Health Department plan check through permit issuance
What it means for your project
Repetition builds judgment. The lessons from dozens of café openings — where plan checkers focus, which existing buildings hide expensive surprises, how to fit a high-output bar into a narrow lease space — now inform every hospitality project we take on.
Gallery
Selected locations.
Click any image to view it full screen.








Consultation
Planning your next café?
Work directly with Dr. Sheida Moradi from initial feasibility through construction permitting.
- 01A reply within one business dayEvery inquiry is read by the principal.
- 02A feasibility conversationZoning, scope, budget and approvals — before you commit.
- 03A clear proposalDefined scope, deliverables and permitting path.